01 · c. 1948-1968
1950s-60s Housing Executive / Whitewell semi
Standardised three-bed semi stock across Whitewell and the older Glengormley streets. Cavity-wall brick, pitched roof, 75-90 sqm.
Typical setup
High share of back boilers still in service, in living-room fireplace. Un-modernised examples still run the original gas fire + back boiler. Converted examples have combis fitted during 2000s-2010s upgrades.
Common issues
- Back boiler still operational at 55-65% efficiency.
- 50+ year pipework with accumulated sludge.
- Post-conversion pipework routing re-using oversized primary runs.
- Original rads undersized for current insulation.
- Compact kitchen limiting combi repositioning options.
Best practice on replacement
Back-boiler removal with gas-feed cap and chimney assessment. Kitchen or utility combi position with dedicated gas run. Full system flush before commissioning. Magnetic filter fit. Radiator sizing review.