Bathroom Installation

Full bathroom
installations.

Complete bathroom refits across Belfast. Strip-out, structural repair, first and second-fix plumbing, proper tanking, sanitaryware installed.

Full bathroom transformation, Belfast

What we do

End to end.

Every bathroom installers fit is done properly, tanked, commissioned, finished to a standard that lasts.

  1. 01 Full strip-out and removal of the existing bathroom.
  2. 02 Repair of any underlying damage, rot, joist replacement, re-tanking.
  3. 03 First-fix plumbing for new layouts (shower, bath, WC, basin).
  4. 04 Waste and soil pipework, new or extended as required.
  5. 05 Tiling coordination with trusted tilers.
  6. 06 Second-fix plumbing and sanitaryware installation.
  7. 07 Shower enclosure, tray and waterproof tanking.
  8. 08 Final commissioning and test.

Questions

Bathroom FAQ.

Do you do the tiling yourself?

No, we work with trusted tilers and coordinate their work into the programme. You can also supply your own tiler if you prefer.

How long does a full bathroom take?

A straightforward refit is 5–7 working days. A strip-back-to-brick with structural repair (like our water-damage rebuild) can be 10–14 days.

Can you source the sanitaryware?

Yes, from trade suppliers at a discount. Or you can supply your own and we just fit. Either works.

Do you handle waterproofing properly?

Yes, every wet area is tanked before tiling. That's not always standard with cheaper fitters, and it's the difference between a bathroom that lasts 20 years and one that rots in 5 (as we've seen first-hand on rebuild jobs).


Where installers fit

Bathrooms across Greater Belfast.

Installers on our network install bathrooms in Lisburn, Newtownabbey, Bangor, Ballymena and Belfast and the surrounding twenty miles.

Get in touch

Planning a bathroom?

Tell us about the space, your plan, and when you want it started.

We respond the same working day. For anything urgent, send an emergency request.

Get a quote Emergency